Schedule Safeguard
Catch schedule risk across every SKU and milestone before it hits the line.
Days earlier visibility
Catch slips as soon as sources update, not at the next review.
Every SKU covered
Eve watches every gate against your lead-time rules.
Hours back for leads
Daily digests replace Slack chase-down and status meetings.
Schedule Safeguard use cases
Prompt
Watch each SKU against its next gate — prototype, EVT, or tooling release.
Flag if required reviews are still open inside the 7-day buffer.
Alert daily so we do not spend on a gate we cannot pass.
Connectors
SmartsheetEduTab Pro 11 NPI plan
- Google SheetsEduTab Pro 11 EVT checklist
- Slack#volta-product#thermal
EduTab Pro 11
EVT
DVT: Aug 16, 2026
3 days into the 7-day buffer
Prototype gate is Aug 16. Thermal and DFM are still open. A go now would lock tooling on an unfinished design.
Open Tasks: Thermal Review, DFM Review
See EverCurrent in action, native in your workflow.
Featured Connections
Start with where hardware teams live
See Schedule Safeguard in action.
Watch Eve catch slips across every SKU and gate before they hit the line.
Learn about Eve →
Watch with sound